NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation of use of distributed ignition sys on interim basis until NRC review of final sys design is completed.Commitment to adopt listed procedures required in 30 days.

Accession Number: ML17319B120

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer