Home > NRC Library > ADAMS Public Documents
Westinghouse Hematite Decommissioning Project - Request for NRC Review of Final Status Survey Final Report Volume 4, Chapter 16, Survey Area Release Record for Building Survey Area 01, Survey Unit 05 and Survey Area 02, Survey Unit 20.
Accession Number: ML17311A680
Date Released: Monday, November 20, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17311A684 - Westinghouse Hematite Decommissioning Project - Request for NRC Review of Final Status Survey Final Report Volume 4, Chapter 16, Survey Area Release Record for Building Survey Area 01, Survey Unit 05 and Survey Area 02, Survey Unit 20. (47 page(s), 10/24/2017)
- ML17311A685 - Westinghouse - HDP-PR-FSS-701, Final Status Survey Plan Development, Revision 7, Appendix P-3, BSA-01-05 FSS Plan. (12 page(s), 6/12/2015)
- ML17311A686 - Westinghouse - Procedure HDP-PR-HP-311, Revision 1, Radiological Surveys, Log Number HDP-PF-061815-029 (BSA 01-05) B110 HVAC Ducts. (2 page(s), 7/15/2015)
- ML17311A688 - Analytical Report, Job ID: J18480-1, UDS Level 2 Report Final Report. (15 page(s), 9/6/2016)
- ML17311A701 - Westinghouse - HDP-PR-FSS-701, Final Status Survey Plan Development, Revision 8, Appendix P-3, BSA-02-20 FSS Plan. (21 page(s), 10/2/2015)
- ML17311A705 - Westinghouse - Procedure HDP-PR-HP-311, Revision 1, Radiological Surveys, Log Number 7184 C 160314. (2 page(s), 3/22/2016)
- ML17311A706 - Analytical Report, Job ID: J17454-1 UDS Level 2 Report Final Report. (15 page(s), 6/27/2016)