NRC Logo

Home > NRC Library > ADAMS Public Documents

Informs that during recent Unit 1 Cycle 5 reload,new fuel assemblies installed under provisions of 10CFR50.59, containing Guardian debris resistant grid design feature. "PVNGS Unit 1 Cycle 5 Startup Rept" encl.

Accession Number: ML17310B078

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer