NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 92-005-01 re failure to perform ASME Code Class 2 Train B charging pump testing within max allowable surveillance interval.Encl discusses root cause determination & corrective actions.

Accession Number: ML17306B186

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer