NRC Logo

Home > NRC Library > ADAMS Public Documents

Application for amends to Licenses NPF-41,NPF-51 & NPF-74, revising TS Surveillance Requirement 4.8.1.1 re ac sources to change KW value of Train A HPSI pump from 696 KW to 771 KW & load sequencing for 24 h surveillance tests.

Accession Number: ML17305B708

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer