NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation accepting continued operation of Unit 3 reactor coolant pump shafts until modified shafts installed at next refueling outage,based on speed of crack development in Units 1 & 2 & early detection capability.

Accession Number: ML17304A885

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer