NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards results of Procedure 91PE-1SI08,Sections 8.16 & 8.17 re safety injection full flow verification test. Confirmation of available NPSH for ECCS pumps per SER (NUREG-0857) criteria resolved.

Accession Number: ML17298B328

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer