Home > NRC Library > ADAMS Public Documents
Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to close out SER (NUREG-0892) Confirmatory Issue 22, "Assurance of ESF Functioning (II.K.1.5)" & "Safety-Related Sys Operability Status (II.K.1.10)."
Accession Number: ML17277A534
Date Released: Wednesday, June 27, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17277A533 - Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to close out SER (NUREG-0892) Confirmatory Issue 22, "Assurance of ESF Functioning (II.K.1.5)" & "Safety-Related Sys Operability Status (II.K.1.10)." (4 page(s), 3/23/1983)
- ML17277A535 - Rev 2 to Procedure 1.5.1, "Tech Spec Surveillance Testing Program." (21 page(s), 2/7/1983)
- ML17277A536 - Rev 3 to Procedure 1.3.1, "Standing Orders." (5 page(s), 12/3/1982)
- ML17277A537 - Rev 1 to Procedure 1.3.6, "Shift Turnover." (7 page(s), 12/14/1982)
- ML17277A538 - Rev 2 to Procedure 1.3.7, "Work Request." (16 page(s), 9/15/1982)
- ML17277A539 - Rev 4 to Procedure 1.3.8, "Equipment Clearance & Tagging." (19 page(s), 6/9/1982)
- ML17277A540 - Rev 1 to Procedure 1.3.9, "Control of Jumpers,Lifted Leads & Test Box Devices." (13 page(s), 7/28/1982)