Home > Site Help > Search Results

Forwards Ginna Nuclear Power Plant EOP,including Rev 7 to AP-TURB.1, "Turbine Trip W/o RX Trip Required" & Rev 8 to FR-C.2, "Response to Degraded Core Cooling."

Accession Number: ML17263A305

Date Released: Monday, April 30, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer