Home > NRC Library > ADAMS Public Documents
Forwards addl info related to EDG monthly surveillance testing,motor overcurrent alarms & dc sys design basis,per 910930 meeting to discuss findings from Electrical Distribution Sys Functional Insp 50-245/91-81.
Accession Number: ML17262B224
Date Released: Wednesday, April 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17311A111 - Forwards addl info related to EDG monthly surveillance testing,motor overcurrent alarms & dc sys design basis,per 910930 meeting to discuss findings from Electrical Distribution Sys Functional Insp 50-245/91-81. (20 page(s), 10/7/1991)
- ML17311A112 - Rev 18 to Station Procedure SP 668.1, "Diesel Generator Operational Readiness Demonstration." (17 page(s), 7/19/1991)
- ML17262B223 - Change 1 to Rev 0 of "MP-1 Diesel Generator Load Study-LOCA & LNP Conditions." (2 page(s), 12/19/1990)
- ML17311A116 - Change 2 to Rev 0 of "MPI DG Loading." (4 page(s), 5/9/1991)
- ML17311A117 - Change 3 to Rev 0 of "MP-1 Diesel Generator Loading." (3 page(s), 6/24/1991)
- ML17311A118 - Change 4 to Rev 0 of "MP-1 Diesel Generator Loading." (3 page(s), 7/29/1991)
- ML17311A119 - Change 5 to Rev 0 of "MP-1 Diesel Generator Loading." (3 page(s), 8/22/1991)
- ML17311A120 - "Millstone Unit 1 Diesel Generator DC Field Rewind." (28 page(s), 7/15/1991)
- ML17262B225 - Rev 1 to Specification SP-EE-146, "PA 83-068 Specification for Millstone Unit 1 Replacement 125 Volt Station Batteries." (39 page(s), 2/2/1984)
- ML17262B226 - Rev 0 to Design Specification 22A1115, "125-Volt DC Sys." (13 page(s), 6/29/1966)