Home > NRC Library > ADAMS Public Documents
Forwards final evaluations of SEP Topics VII-3, "Sys Required for Safe Shutdown" & VIII-2, "Diesel Generator for RE Ginna Nuclear Power Plant." Repts revised per 810123 & 30 comments.Rept will become integrated safety assessment.
Accession Number: ML17258A942
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17258A941 - Forwards final evaluations of SEP Topics VII-3, "Sys Required for Safe Shutdown" & VIII-2, "Diesel Generator for RE Ginna Nuclear Power Plant." Repts revised per 810123 & 30 comments.Rept will become integrated safety assessment. (4 page(s), 4/2/1981)
- ML17258A943 - "SEP Technical Evaluation:Topic VII-03,Electrical, Instrumentation & Control Features of Sys Required for Safe Shutdown," final draft. (24 page(s), 2/27/1981)
- ML17258A944 - "SEP Technical Evaluation:Topic VIII-2,Diesel Generators," final draft. (12 page(s), 3/3/1981)