Home > NRC Library > ADAMS Public Documents
Forwards repts of addl confirmatory testing,as Addendums 1-4 to "Steam Generator Evaluation,Ginna Steam Tube Failure Incident,820125,RE Ginna Nuclear Power Plant," submitted 820426.
Accession Number: ML17256A978
Date Released: Monday, April 30, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17309A268 - Forwards repts of addl confirmatory testing,as Addendums 1-4 to "Steam Generator Evaluation,Ginna Steam Tube Failure Incident,820125,RE Ginna Nuclear Power Plant," submitted 820426. (4 page(s), 5/25/1982)
- ML17256A977 - Addendum 1, "Lab Collapse Tests," Revision 0,to "Steam Generator Evaluation,Ginna Steam Tube Failure Incident, 820125,RE Ginna Nuclear Power Plant." (32 page(s), 5/18/1982)
- ML17256A979 - Addendum 2, "Lab Fatigue Testing," Revision 0,to "Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant." (20 page(s), 5/18/1982)
- ML17256A981 - Addendum 3, "Phase II Metallurgical Exams," Revision 0,to "Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant." (21 page(s), 5/18/1982)
- ML17256A983 - Addendum 4, "External Tube Loading Test," Revision 1 to "Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant." (52 page(s), 5/18/1982)