Home > NRC Library > ADAMS Public Documents
Surry, Units 1 and 2 - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information.
Accession Number: ML17251A864
Date Released: Monday, September 18, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17251A895 - Surry, Units 1 and 2 - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information. (73 page(s), 8/31/2017)
- ML17251A897 - Surry, Units 1 and 2 - Enclosure 3 to 17-296, Affidavit from Structural Group. (9 page(s), 8/24/2017)
- ML17251A898 - Surry, Units 1 and 2 - Affidavit from Simpson Gumpertz & Heger, Inc. (5 page(s), 8/16/2017)
- ML17251A900 - Surry, Units 1 and 2 - Enclosure 2, Attachment E to 17-296, "WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17". (9 page(s), 6/5/2017)