Home > NRC Library > ADAMS Public Documents
Forwards Rev 2 to Procedure PT-32.5, "Reactor Trip Breakers A & B Train Response Time Testing" & Rev 7 to Procedure M-32.2, "DB-50 Reactor Trip Circuit Breaker Insp...," in compliance w/Generic Ltr 83-28,Items 4.2.1 & 4.2.2.
Accession Number: ML17251A631
Date Released: Monday, April 30, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17251A630 - Forwards Rev 2 to Procedure PT-32.5, "Reactor Trip Breakers A & B Train Response Time Testing" & Rev 7 to Procedure M-32.2, "DB-50 Reactor Trip Circuit Breaker Insp...," in compliance w/Generic Ltr 83-28,Items 4.2.1 & 4.2.2. (3 page(s), 4/7/1986)
- ML17251A632 - Rev 2 to Procedure PT-32.5, "Reactor Trip Breaker A & B Train Response Time Testing." (6 page(s), 3/22/1985)
- ML17251A633 - Rev 7 to Procedure M-32.2, "DB-50 Reactor Trip Circuit Breaker Insp,Maint & Test." (43 page(s), 3/27/1985)