Home > NRC Library > ADAMS Public Documents
FY18(09/18) - 50336 MILLSTONE Unit 2 Initial Operator Exam (Fac Dev) (CAC 000500)
Accession Number: ML17234A732
Date Released: Monday, February 14, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18029A651 - Millstone Power Station, Unit 2 - Senior Reactor and Reactor Operator Initial License Examinations. (4 page(s), 1/29/2018)
- ML18248A266 - Millstone Power Station, Unit 2 - Operator Licensing Examination Approval. (3 page(s), 9/4/2018)
- ML18323A272 - Millstone Unit 2 - Final Operating Test (Parts A, B and C) (Folder 3). (811 page(s), 1/29/2018)
- ML18323A273 - Millstone, Unit 2 - Final Written Examination with Answer Key (401-5 Format)(Folder 3). (129 page(s), 1/31/2018)
- ML18323A274 - Millstone Unit 2 - Post Exam Comments and Resolution, and Technical References. (2 page(s), 1/29/2018)
- ML18325A108 - Millstone Power Station, Unit 2 - Initial Operator Licensing Examination Report 05000336/2018301. (9 page(s), 11/20/2018)
- ML19044A566 - Millstone, Unit 2 - Draft Operating Test (Parts A, B and C)(Folder 2) (417 page(s), 2/13/2019)
- ML19044A586 - Millstone Unit 2 - Draft Written Examination (Folder 2) (149 page(s), 2/13/2019)
- ML19044A606 - Millstone Unit 2 - NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) (7 page(s), 2/13/2019)
- ML19045A271 - Millstone, Unit 2 - Handouts to Applicants (Folder 3) (14 page(s), 2/14/2019)
- ML19045A343 - Millstone, Unit 2 - Final QA Related Forms (Folder 1) (14 page(s), 2/14/2019)
- ML19045A416 - Millstone Unit 2 - Draft Written Examination and Operating Test Outlines (Folder 2) (43 page(s), 2/14/2019)
- ML19045A424 - Millstone, Unit 2 - Final Written Examination and Operating Test Outlines (Folder 3) (28 page(s), 2/14/2019)