Home > NRC Library > ADAMS Public Documents
Fifteenth partial response to FOIA request for records. App Y records encl & available in PDR.
Accession Number: ML17229A261
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20136C421 - Fifteenth partial response to FOIA request for records. App Y records encl & available in PDR. (7 page(s), 3/6/1997)
- ML20136D630 - "Status Rept for St Lucie,Units 1 & 2." (46 page(s), 2/28/1996)
- ML20136E271 - Morning rept 2-94-0073:plants announced that listed orgainzation changes will become effective 940901. (1 page(s), 8/8/1994)
- ML20136E546 - Forwards file submitted to Kerry on 961024 re PIM-like summary of events from 92-93. (9 page(s), 11/14/1996)
- ML20136C839 - "Plant Status Rept,Turkey Point." (32 page(s), 2/29/1996)
- ML20136C664 - "Plant Information Book,Vol 1-Emergeny Response,Units 1 & 2." (400 page(s), 7/24/1992)
- ML20136E926 - Forwards SALP Input Feeder Info at St Lucie facility from 940102-960106 & requests that technical staff complete review by 951222. (123 page(s), 3/6/1997)
- ML20136E569 - Forwards plant calendar update. (7 page(s), 10/28/1996)
- ML20136E377 - Forwards matrix containing status of significant issues identified from recent refueling outage at plant Unit 1. (3 page(s), 7/19/1996)
- ML20136E469 - Discusses criticality monitoring ltr & requests response to listed question. (2 page(s), 10/31/1996)
- ML20136D456 - Forwards St Lucie Cycle 11 SALP Input Feeder Form M/S. (47 page(s), 12/15/1995)
- ML20136E679 - Forwards background info on St Lucie Nuclear Instrumentation Insp. (10 page(s), 11/18/1996)
- ML20136E579 - Discusses plant NI EAW. (1 page(s), 10/28/1996)
- ML20136E360 - Submits rept from K Clark re plant Special Insp Team News Conference. (3 page(s), 8/23/1996)
- ML20136C941 - "Plant Status Rept,Crystal River,Unit 3." (63 page(s), 2/29/1996)
- ML20138E175 - Informs that plant would fit best into schedule outlined at previous meeting re site visit for Prime Minister Chernomyrdin. (12 page(s), 8/10/1993)
- ML20136E555 - Forwards draft insp repts 50-335/95-15 & 50-389/95-15 on 960907-1012. (29 page(s), 10/28/1996)
- ML20136D892 - Morning rept 2-96-0035:licensee announced on 960417 that A Stall will join util as site Vice President at plant effective 960513. (1 page(s), 4/24/1996)
- ML20136D944 - Morning rept 2-96-0003:on 960109 licensee announced reassignment of DA Sager to position of Vice President of Nuclear Assurance due to retirement of JE Gieger. (1 page(s), 1/10/1996)
- ML20136C755 - "Plant Status Rept for St Lucie,Units 1 & 2." (48 page(s), 9/30/1995)
- ML20136E699 - Requests info re Sheron St Lucie visit.Info requested by 961120. (183 page(s), 11/19/1996)
- ML20138E983 - Requests for assistance in addressing issues re plant emergency diesel generator fuel oil transfer sys leak isolation & using operation action in place of automatic action. (15 page(s), 8/28/1995)
- ML20136C820 - Provides summary of discussion & staff actions re 950921 plant performance review.List of participants,changes to MIP & matrix trend charts encl. (25 page(s), 10/10/1995)
- ML20136E484 - Forwards document re plant large break LOCA issues. (4 page(s), 10/24/1996)
- ML20136E307 - Morning rept 2-93-0096:mgt changes have been announced affecting licensee organization & plant site,effective 931001. (1 page(s), 9/20/1993)
- ML20136E622 - Informs that draft IN on operator activities affecting reactivity being distributed. (1 page(s), 11/19/1996)
- ML20136E539 - Forwards info re plant large break LOCA issue. (4 page(s), 10/24/1996)
- ML20136D435 - Forwards St Lucie Cycle 11 SALP Input Feeder Form M/S for review & requests outline rept by 960109. (3 page(s), 12/22/1995)
- ML20136E454 - Forwards answers to RA questions re plant self assessment. (4 page(s), 10/24/1996)
- ML20136E396 - Informs that violation withdrawn re licensee use of CCW/ICW (svc water) in Mode 5 at plant. (1 page(s), 10/31/1996)
- ML20136E491 - Forwards updated schedule for St Lucie FY1. (8 page(s), 11/13/1996)
- ML20136E234 - Morning rept 2-95-0072:D Sager announced listed mgt changes to be effective 950822. (1 page(s), 8/23/1995)
- ML20136D855 - "Plant Status Rept." (200 page(s), 8/31/1996)
- ML20138E931 - Forwards agenda for 960122 IPE Senior Review Board meeting re contractor-developed requests for addl info for plants. (2 page(s), 12/21/1995)
- ML20136E255 - Morning rept 2-95-0004:licensee President S Frank resigned on 950104 & J Broadhead will assume Frank duties on iterim basis. (1 page(s), 1/5/1995)
- ML20136C714 - "Plant Status Rept for St Lucie." (38 page(s), 6/30/1994)
- ML20136E025 - Morning rept 2-95-0092:licensee announced,Nov 2,layoffs of 25 employees at plants in Fort Pierce,FL & Nov 1 of 40 employees at plants in Florida City,FL & corporate headquarters. (1 page(s), 11/3/1995)
- ML20136E448 - Requests that all managers & inspectors assigned to plant read self-assessment,for period Jan 1994 & May 1996 & provide brief written assessment of areas responsible for. (1 page(s), 10/8/1996)
- ML20136C742 - Discusses two unresolved items pending TSs interpretations re insp repts 50-335/94-09 & 50-389/94-09. (5 page(s), 3/19/1994)
- ML20136D476 - "Plant Status Rept for St Lucie." (175 page(s), 10/31/1994)
- ML20136D508 - "St Lucie SALP for 940102-960106,SALP Board Meeting 960118." (245 page(s), 1/18/1996)
- ML20136D917 - Morning rept 2-96-0031:licensee announced that,effective 960415,D Sager was no longer w/util.B Acosta was named Acting Head of Nuclear Assurance. (1 page(s), 4/17/1996)
- ML20136D872 - Submits list of barriers which failed during St Lucie PIG inoperability. (1 page(s), 4/10/1996)
- ML20136E402 - Forwards Allegation Evaluation Rept which summarizes review & independent insp of failure to adhere to administrative steps in closure of plant action requests when licensee rushed corrective action program change.W/o insp repts. (4 page(s), 9/14/1996)
- ML20136E688 - Forwards background info on St Lucie Nuclear Instumentation Insp. (10 page(s), 11/18/1996)
- ML20136D958 - Forwards matrix of major work activities & significant mods to be accomplished during refueling outage at plant,Unit 1. Unit scheduled to restart on 960609. (11 page(s), 4/11/1996)
- ML20136E608 - Provides list of corrective actions that have been rolled into Speakout Program. (1 page(s), 11/15/1996)
- ML20136E301 - Forwards schedule for activities at plant for next few months. (9 page(s), 10/31/1996)
- ML20136E441 - Forwards Allegation Evaluation Rept RII-96-A-0129,which summarized findings of review & independent insp re maint manager unprofessionalism & violation of freeze seal procedure.W/o insp repts 50-335/96-11 & 50-389/96-11. (10 page(s), 9/14/1996)
- ML20136E564 - Replies to news summary re escalated enforcement for plant on 961025. (1 page(s), 10/28/1996)
- ML20136C829 - Informs that staff believes that NRC interpretation of term "directly supervised" counterproductive. (2 page(s), 9/22/1981)
- ML20136E387 - Forwards allegation evaluation rept RII-96-A-0056,which summarizes findings & insp results re personnel executed switching order & manipulated equipment w/o knowledge of control room personnel. (6 page(s), 8/6/1996)
- ML17229A260 - Forwards util response to violations noted in insp repts 50-335/96-12 & 50-389/96-12 re inconsistencies between NRC position,in response to TIA 95-013 & NRC Insp Manual Chapter,Part 9900 Interim Guidance on 10CFR50.59 (1 page(s), 11/14/1996)
- ML20136E283 - Morning rept 2-93-0106:licensee continues w/corporate cost reduction program,including Nuclear Div.Staffing reductions being announced effective 931001. (1 page(s), 10/1/1993)
- ML20136C800 - "Plant Status Rept,St Lucie,Units 1 & 2." (49 page(s), 2/29/1996)