Home > NRC Library > ADAMS Public Documents
Forwards SG run time analysis for cycle 14 of plant,Unit 1, which includes responses to NRC RAI dtd 960726 & util contractor repts which demonstrates that all significant parameters of draft reg guide have been met.
Accession Number: ML17229A091
Date Released: Thursday, January 25, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17229A090 - Forwards SG run time analysis for cycle 14 of plant,Unit 1, which includes responses to NRC RAI dtd 960726 & util contractor repts which demonstrates that all significant parameters of draft reg guide have been met. (5 page(s), 10/24/1996)
- ML17229A092 - "Steam Generator Run Time Analysis,Cycle 14," for St Lucie Unit 1. (62 page(s), 10/24/1996)
- ML17229A093 - "Analysis of ODSCC/IGA at Tubesheet & Tube Support Locations at St Lucie Unit 1." (80 page(s), 10/31/1996)
- ML17229A094 - Rev A to SAIC 05-5049-05-6734-500, "Steam Generator Degradation Specific Mgt Leakage Limit Calculation for St Lucie Unit 1." (34 page(s), 8/30/1996)
- ML17229A095 - Rev 0 to 00000-OSW-16, "In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage." (24 page(s), 10/24/1996)
- ML17229A096 - Rev 0 to TR-9419-CSE96-1101, "Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination." (17 page(s), 6/12/1996)
- ML17229A097 - Rev 0 to TP-9419-CSE96-2104, "Steam Generator Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination." (30 page(s), 6/10/1996)