NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards SG run time analysis for cycle 14 of plant,Unit 1, which includes responses to NRC RAI dtd 960726 & util contractor repts which demonstrates that all significant parameters of draft reg guide have been met.

Accession Number: ML17229A091

Date Released: Thursday, January 25, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer