Home > NRC Library > ADAMS Public Documents
Application for amend to License DPR-67,revising TS Figure 2.1-1,Tables 2.2-1 & 3.2-1 & Bases pages B2-1 & B2-2 for reduction of RCS design flow to accomodate future SG tube plugging up to 25% (average).
Accession Number: ML17227A785
Date Released: Thursday, January 25, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17227A784 - Application for amend to License DPR-67,revising TS Figure 2.1-1,Tables 2.2-1 & 3.2-1 & Bases pages B2-1 & B2-2 for reduction of RCS design flow to accomodate future SG tube plugging up to 25% (average). (7 page(s), 3/19/1993)
- ML17227A786 - Proposed tech specs for reduction in RCS design flowrate from current value of 370,000 gpm to 355,000 gpm. (41 page(s), 3/19/1993)
- ML17227A787 - "St Lucie Unit 1 Chapter 15 Event Review & Analysis for 25% Steam Generator Tube Plugging." (60 page(s), 2/28/1993)
- ML17227A788 - "St Lucie Unit 1 Large Break LOCA/ECCS Analysis w/25 + or - 7% SG Tube Plugging." (52 page(s), 2/28/1993)
- ML17227A789 - "Siemens Power Corp,St Lucie Unit 1 Small Break LOCA Analysis." (64 page(s), 2/28/1993)