Home > NRC Library > ADAMS Public Documents
Transmittal of Revision 1 of Chapters 10.0, 11.0, 12.0 (including Appendices 12A, 12b and 12C) and 14.0 and Revision 2 of Chapters 2.0, 30., 6.0, 7.0, 8.0 and 13.0 of NWMI-2013-021, Construction Permit Application for Radioisotope Production.
Accession Number: ML17221A370
Date Released: Thursday, August 17, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17221A199 - Transmittal of Revision 1 of Chapters 10.0, 11.0, 12.0 (including Appendices 12A, 12b and 12C) and 14.0 and Revision 2 of Chapters 2.0, 3.0, 6.0, 7.0, 8.0 and 13.0 of NWMI-2013-021, Construction Permit Application for Radioisotope Production. (5 page(s), 8/7/2017)
- ML17221A200 - Attachment 3 to NWMI-LTR-2017-011 - NWMI-2013-021, Rev. 2, Chapter 2.0 - Site Characteristics Construction Permit Application for Radioisotope Production Facility and Rev. 2 to Chapter 3.0, Design of Structures, Systems, and Components. (227 page(s), 8/5/2017)
- ML17221A201 - Attachment 3 to NWMI-2013-021, Rev. 2, Chapter 6.0 - Engineered Safety Features Construction Permit Application for Radioisotope Production Facility to Chapter 11.0 - Radiation Protection and Waste Management. (236 page(s), 8/5/2017)
- ML17221A202 - Attachment 3 to NWMI-2013-021, Rev. 1, Chapter 12 - Conduct of Operations Construction Permit Application for Radioisotope Production Facility. (145 page(s), 8/5/2017)
- ML17221A203 - Attachment 3 to NWMI-2013-021, Rev. 2, Chapter 13.0 - Accident Analysis Construction Permit Application for Radioisotope Production Facility and Chapter 14.0 - Technical Specifications. (127 page(s), 8/5/2017)