Home > NRC Library > ADAMS Public Documents
Diablo Canyon, Units 1 an 2, Submittal of Revised Updated Safety Analysis Report, Revision 23.
Accession Number: ML17206A046
Date Released: Wednesday, July 26, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17157B366 - Diablo Canyon, Units 1 an 2, Submittal of Revised Updated Safety Analysis Report, Revision 23. (7 page(s), 5/3/2017)
- ML17206A048 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 1. (102 page(s), 12/31/2016)
- ML17206A058 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Site Characteristics. (461 page(s), 12/31/2016)
- ML17206A059 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Design of Structures, Components, Equipment, And Systems. (1004 page(s), 12/31/2016)
- ML17206A060 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 4, Reactor. (270 page(s), 12/31/2016)
- ML17206A061 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System. (309 page(s), 12/31/2016)
- ML17206A062 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 6, Engineered Safety Features (Redacted). (505 page(s), 12/31/2016)
- ML17206A064 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 7. (261 page(s), 12/31/2016)
- ML17206A065 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 8, Electric Power. (154 page(s), 12/31/2016)
- ML17206A066 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 9, Auxiliary Systems (Redacted). (1197 page(s), 12/31/2016)
- ML17206A049 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 10, Steam and Power Conversion System. (101 page(s), 12/31/2016)
- ML17206A050 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 11, Radioactive Waste Management. (290 page(s), 12/31/2016)
- ML17206A051 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 12, Radiation Protection (Redacted). (85 page(s), 12/31/2016)
- ML17206A053 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 13, Conduct of Operations. (43 page(s), 12/31/2016)
- ML17206A054 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 14, Initial Tests and Operation. (41 page(s), 12/31/2016)
- ML17206A055 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 15, Accident Analyses. (628 page(s), 12/31/2016)
- ML17206A056 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 16, Technical Specifications and Equipment Control Guidelines. (6 page(s), 12/31/2016)
- ML17206A057 - Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 17, Quality Assurance. (67 page(s), 12/31/2016)