Home > NRC Library > ADAMS Public Documents
Provides 2017-2018 Surety Estimate Along With Water Balance and Restoration Schedule for Smith Ranch - Highland Uranium Project, For NRC Review.
Accession Number: ML17192A340
Date Released: Monday, July 31, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17192A348 - Provides 2017-2018 Surety Estimate Along With Water Balance and Restoration Schedule for Smith Ranch - Highland Uranium Project, For NRC Review. (1 page(s), 6/21/2017)
- ML17192A349 - Smith Ranch Highland Uranium Project, 2017-2018 Surety Estimate Update. (24 page(s), 6/21/2017)
- ML17192A350 - Smith Ranch Highland Uranium Project, Revised Mining and Reclamation Plan. (1 page(s), 6/14/2017)
- ML17192A351 - Smith Ranch Highland Uranium Project, Mining and Reclamation Plan. (1 page(s), 6/14/2017)
- ML17192A352 - Smith Ranch Highland Uranium Project, Revised Water Balance. (1 page(s), 6/21/2017)
- ML17192A353 - Smith Ranch Highland Uranium Project, Revised Water Balance. (1 page(s), 6/21/2017)