This package has no contents NRC: Package ML17191B427 - Forwards LER 99-003-01,describing reactor recirculation B loop,high pressure flow element venturi instrument line steam leakage resulting in Unit 3 shutdown,due to fatigue of socket welded pipe joint.Commitment,listed.

Home > Site Help > Search Results

Forwards LER 99-003-01,describing reactor recirculation B loop,high pressure flow element venturi instrument line steam leakage resulting in Unit 3 shutdown,due to fatigue of socket welded pipe joint.Commitment,listed.

Accession Number: ML17191B427

Date Released: Monday, July 31, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer