NRC Logo

Home > NRC Library > ADAMS Public Documents

Informs that per 10CFR50.59 Comm Ed changed shutdown margin TS bases section 3.3.A.1 for Licenses DPR-19,DPR-25,DPR-29 & DPR-30,requiring that in-sequence SDM test,instead of local SDM test performed during start-up after refueling.

Accession Number: ML17180A959

Date Released: Monday, July 31, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer