Home > NRC Library > ADAMS Public Documents
Watts Bar 2013-302
Accession Number: ML17165A518
Date Released: Wednesday, June 21, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13297A187 - Watts Bar Nuclear Power Plant, Operator Licensing Written Examination Approval 05000390/13-302. (2 page(s), 10/10/2013)
- ML13346A983 - ER 05000390-13-302; Operating Test, October 22 - 25, 2013, & Written Examination, October 30, 2013; Watts Bar Nuclear Power Plant; Operator License Examinations. (12 page(s), 12/11/2013)
- ML17165A477 - Watts Bar 2013-302 Draft Administrative Documents. (59 page(s), 6/14/2017)
- ML17165A487 - Watts Bar 2013-302 Draft Administrative JPMs. (150 page(s), 6/14/2017)
- ML17165A485 - Watts Bar 2013-302 Draft Simulator and In Plant JPMs. (328 page(s), 6/14/2017)
- ML17165A483 - Watts Bar 2013-302 Draft Simulator Scenarios. (396 page(s), 6/14/2017)
- ML17165A491 - Watts Bar 2013-302 Final Administrative Documents. (89 page(s), 6/14/2017)
- ML17165A495 - Watts Bar 2013-302 Final Administrative JPMs. (150 page(s), 6/14/2017)
- ML13312A419 - Watts Bar 2013-302 Final RO Written Exam. (96 page(s), 11/8/2013)
- ML17165A494 - Watts Bar 2013-302 Final Simulator and In Plant JPMs. (331 page(s), 6/14/2017)
- ML17165A493 - Watts Bar 2013-302 Final Simulator Scenarios (637 page(s), 6/14/2017)
- ML13312A425 - Watts Bar 2013-302 Final SRO Written Exam. (58 page(s), 11/8/2013)
- ML17165A515 - Watts Bar 2013-302 General Correspondence Redacted. (14 page(s), 6/14/2017)
- ML13312A453 - Watts Bar 2013-302 Post Exam Comments. (9 page(s), 11/8/2013)
- ML17165A537 - Watts Bar 2013-302 Draft RO Written Exam. (279 page(s), 6/14/2017)
- ML17165A541 - Watts Bar 2013-302 Draft SRO Written Exam. (94 page(s), 6/14/2017)