Home > NRC Library > ADAMS Public Documents
Forwards proposed amend 186 to license NPF-14,extending on one time basis,AOT from 3 to 7 days for one offsite circuit being out of svc.Engineering Study EC-RISK-1050, "Impact of Extending T-10 AOT From 3 to 7 Days" also encl.
Accession Number: ML17164A660
Date Released: Monday, September 18, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17164A659 - Forwards proposed amend 186 to license NPF-14,extending on one time basis,AOT from 3 to 7 days for one offsite circuit being out of svc.Engineering Study EC-RISK-1050, "Impact of Extending T-10 AOT From 3 to 7 Days" also encl. (10 page(s), 4/11/1995)
- ML17164A661 - Proposed amend 186 to license NPF-14,extending on one time basis AOT from 3 to 7 days for one offsite circuit being out of svc. (2 page(s), 4/11/1995)
- ML17164A662 - Proposed tech spec 3.8.1.1,Action a.3 footnote,allowing on one time basis,one offsite circuit to be out of svc for up to 7 days during const & installation of T-10 tap 230 kV switch yard during Unit 2 seventh refueling & insp outage. (2 page(s), 4/11/1995)
- ML17164A663 - "Impact of Extending T-10 AOT From 3 to 7 Days." (17 page(s), 4/11/1995)