Home > NRC Library > ADAMS Public Documents
2018 Clinton Initial License Exam - Proposed Exam
Accession Number: ML17164A367
Date Released: Saturday, September 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19238A105 - ES-301-3 and ES-301-4 (3 page(s), 8/23/2019)
- ML19238A115 - ES-301-6 (14 page(s), 8/23/2019)
- ML19238A126 - Proposed Examination Submittal Letter (3 page(s), 8/23/2019)
- ML19238A137 - ES-401-6 (1 page(s), 8/23/2019)
- ML19238A142 - Proposed Control Room and In-Plant JPMs (117 page(s), 8/23/2019)
- ML19238A147 - Proposed RO Admin JPMs (46 page(s), 8/23/2019)
- ML19238A152 - Proposed RO Written Exam with Answer Key (248 page(s), 8/23/2019)
- ML19238A155 - Proposed Scenarios (95 page(s), 8/23/2019)
- ML19238A159 - Proposed SRO Admin JPMs (46 page(s), 8/23/2019)
- ML19238A164 - Proposed SRO Written Exam with Answer Key (98 page(s), 8/23/2019)