Home > NRC Library > ADAMS Public Documents
Forwards documents referenced in suppl 16 to NUREG-0933.
Accession Number: ML17160A485
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20058N601 - Forwards documents referenced in suppl 16 to NUREG-0933. (1 page(s), 11/29/1993)
- ML20058N676 - Discusses action item 5 assigned in 880406 memo related to diagnostic evaluation team report for plant on pump damage due to low flow cavitation. (2 page(s), 10/18/1988)
- ML20058J932 - Informs that subsequent to receipt of addl info to verify that tube stresses remain within original design basis after proposed changes in steam generator level limits,branch will submit evaluation of impact of proposed Tech Spec change. (1 page(s), 3/8/1984)
- ML20058J927 - Requests assistance in evaluating thermal stresses which might result from Tech Spec change to steam generator operating level. (1 page(s), 2/23/1984)
- ML20058K941 - Forwards evaluation of postulated loss of dc bus resulting in elevated core damage frequencies,performed during IPEs. Number of misconceptions by NRC re PRA results clarified. (4 page(s), 4/22/1991)
- ML20058N955 - Provides input for action plan for resolving failure of tendon anchorage at facility & for determining need for immediate licensing action on other facilities. (2 page(s), 7/31/1985)
- ML20058J936 - Comments on once-through steam generator structural integrity concerns connected w/operation of downcomer water levels above aspirator ports.If tube or wall stresses exceeded design limits,failures could be postulated. (2 page(s), 7/3/1984)
- ML17160A484 - Discusses prioritization of GI 161 re associated circuits. (2 page(s), 3/12/1993)
- ML20058J961 - Forwards request for addl info from applicant re sources of water available to provide feedwater to steam generators & assure long-term cooling. (2 page(s), 5/13/1985)
- ML20058J939 - Discusses question re operation of once-through steam generators w/water level above aspirator ports. Notification re safety implications of amend requested. (2 page(s), 5/21/1984)
- ML20058N917 - Provides daily highlight re 880228 feed/power mismatch that resulted in stopped main feedwater valve movement while bypass valves were closing to increase delta p control. Caused by defective solenoid spring.Solenoid replaced. (8 page(s), 3/4/1988)