Home > Site Help > Search Results

Forwards LER 95-008 shift average thermal power level for Unit 2 was exceeded by up to 4 MWt during Unit 2 Cycle 7 operation as result of instrumentation problems.

Accession Number: ML17158A757

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer