Home > Site Help > Search Results

Forwards LER 95-005 re reactor scram following turbine trip on load reject.Generator load rejection occurred when 500 kV switchyard main distribution circuit breaker opened, isolating main generator from power grid.

Accession Number: ML17158A672

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer