Home > NRC Library > ADAMS Public Documents
Forwards safety evaluation accepting util inservice testing program relief requests for pumps & valves for second 10-yr interval,provided items identified in section 5 of TER addressed within 1-yr or by end of next refueling outage.
Accession Number: ML17158A652
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17158A651 - Forwards safety evaluation accepting util inservice testing program relief requests for pumps & valves for second 10-yr interval,provided items identified in section 5 of TER addressed within 1-yr or by end of next refueling outage. (4 page(s), 4/26/1995)
- ML17158A653 - Safety evaluation accepting util inservice testing program relief requests for pumps & valves for second 10-yr interval provided action items identified in section 5 of TER addressed within 1-yr or by end of next refueling outage. (17 page(s), 4/26/1995)
- ML20080L686 - "Technical Evaluation Rept:PP&L,Susquehanna Steam Electric Station,Pump & Valve Inservice Testing Program,Rev 10,Unit 1 Second 10-Yr Interval,Rev 7,Unit 2 Second 10-Yr Interval." (111 page(s), 2/28/1995)