Home > Site Help > Search Results

Forwards LER 93-012-00 re entry into TS 3.0.3 due to failure of ECCS low reactor pressure permissive switch.Reactor shut- down initiated but not completed since switch repaired prior to reaching 1 h limit to take action.

Accession Number: ML17157C539

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer