Home > NRC Library > ADAMS Public Documents
Forwards "Technical Evaluation Rept on Response From Pennsylvania Power & Light Co to Generic Ltr 88-01 re Susquehanna Steam Electric Station,Unit 2." RCS leakage measurements may be taken every 8 h instead of 4 h,per ltr.
Accession Number: ML17157A030
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17157A029 - Forwards "Technical Evaluation Rept on Response From Pennsylvania Power & Light Co to Generic Ltr 88-01 re Susquehanna Steam Electric Station,Unit 2." RCS leakage measurements may be taken every 8 h instead of 4 h,per ltr. (5 page(s), 2/16/1990)
- ML17157A031 - Safety evaluation supporting util responses to Generic Ltr 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping." (3 page(s), 2/16/1990)
- ML18040A955 - Forwards, "Technical Evaluation Rept on Response... to Generic Ltr 88-01 Pertaining to Susquehanna Steam Electric Station Unit 2," final rept. (1 page(s), 10/31/1989)
- ML18040B261 - "Technical Evaluation Rept on Response From Pennsylvania Power & Light to Generic Ltr 88-01 Pertaining to Susquehanna Steam Electric Station Unit 2," final rept. (33 page(s), 10/31/1989)