NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards final rept, "Primary Reactor Containment Integrated Leakage Rate Test," per App J to 10CFR50.Requests approval to perform next integrated leakage rate test during third refueling outage scheduled for Fall 1989.

Accession Number: ML17146A657

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer