Home > NRC Library > ADAMS Public Documents
Forwards nonproprietary versions of Kraftwerk Union Aktienglesellschaft documents transmitted 771228 & 780105. Responds to NRC 780428 ltr.
Accession Number: ML17138A531
Date Released: Friday, October 25, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18031A117 - Forwards nonproprietary versions of Kraftwerk Union Aktienglesellschaft documents transmitted 771228 & 780105. Responds to NRC 780428 ltr. (65 page(s), 3/15/1979)
- ML19284A738 - Rept translated from German:"Formation & Oscillations of Spherical Gas Bubble Underwater. (24 page(s), 12/31/1978)
- ML17138A530 - Rept translated from German:"Tests on Mixed Condensation w/Model Quenchers." (119 page(s), 5/15/1973)
- ML17138A532 - Rept translated from German:"Condensation & Vent Clearing Tests in GKM w/Perforated Pipes." (112 page(s), 5/10/1973)
- ML19284A739 - Rept translated from German:"Calculation Model to Clarify Pressure Oscillations in Suppression Chamber After Vent Clearing." (31 page(s), 3/29/1972)
- ML17138A533 - Rept translated from German:"Const & Design of Relief Sys w/Perforated Pipe Quencher." (124 page(s), 7/9/1973)
- ML17138A534 - Rept translated from German:"KKB-Vent Clearing w/Perforated Pipe Quencher." (131 page(s), 10/12/1973)
- ML17138A536 - Rept translated from German:"Investigations of Condensation w/Perforated Pipe Quencher w/Small Water Coverage of Quencher Arms." (41 page(s), 12/14/1973)
- ML17138A537 - Rept translated from German:"KKB Const & Task of Relief Sys." (82 page(s), 1/15/1974)
- ML17138A538 - Rept translated from German:"Experimental Studies of Vent Clearing in Model Test Stand." (77 page(s), 7/31/1975)
- ML17138A539 - Rept translated from German:"KKB Specification for Blowdown Tests in Non-Nuclear Hot Test." (80 page(s), 10/4/1974)
- ML17138A540 - Rept translated from German:"Expected Values of Blowdown Tests w/Relief Sys in Non-Nuclear Hot Test at Brunsbuttel Nuclear Power Plant & Their Measurement." (84 page(s), 9/30/1974)
- ML17138A541 - Rept translated from German:"Results of Non-Nuclear Hot Tests w/Relief Sys in Brunsbuttel Nuclear Power Plant." (31 page(s), 12/20/1974)
- ML17138A542 - Rept translated from German:"Analysis of Loads Measured on Relief Sys During Non-Nuclear Hot Test in KKB." (224 page(s), 4/29/1975)
- ML19284A747 - Rept translated from German:"Brunsbuttel Nuclear Power Plant,List of Test Parameters & Most Important Measurement Results of Non-Nuclear Hot Tests W/Pressure Relief Sys." (63 page(s), 8/1/1977)
- ML17138A544 - Rept translated from German:"KKB Spec for Tests to Suppl Relief Value Tests During Nuclear Startup." (63 page(s), 6/20/1975)
- ML17138A546 - Rept translated from German:"KKB-Nuclear Startup,Results of Tests W/Pressure Relief Sys." (31 page(s), 9/30/1976)
- ML17138A548 - Rept translated from German:"Philippsburg Nuclear Power Plant First Extension Hot Test,Spec for Tests of Relief Valves & Emergency & Suppression Chamber Cooling Systems." (88 page(s), 8/28/1975)
- ML17138A545 - Rept translated from German: "Results of Non-Nuclear Hot Test W/Relief Sys in Philippsburg Nuclear Power Plant." (66 page(s), 3/22/1977)
- ML17138A547 - Rept translated from German: "Philippsburg Nuclear Power Plant,List of Test Parameters & Most Important Measurement Results of Non-Nuclear Hot Tests W/Pressure Relief Sys." (22 page(s), 8/2/1977)
- ML17138A549 - Rept translated from German: "Air Oscillations During Vent Clearing W/Single & Double Pipes." (54 page(s), 8/31/1978)