NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 6 to FSAR update for Diablo Canyon Units 1 & 2, reflecting status of plant through 900322 & incorporating listed items,including use of Vantage 5 fuel & addition of turbine valve failure rate,per 10CFR50.71(e).

Accession Number: ML17083C315

Date Released: Tuesday, March 2, 2021

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer