Home > NRC Library > ADAMS Public Documents
Provides results of EPR testing & tensile specimen testing, expected schedules for submittal of fracture toughness testing results 7 evaluation of shroud fluence measurement results.Proprietary rept encl.
Accession Number: ML17059B904
Date Released: Friday, June 30, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17059B903 - Provides results of EPR testing & tensile specimen testing, expected schedules for submittal of fracture toughness testing results 7 evaluation of shroud fluence measurement results.Proprietary rept encl. (26 page(s), 2/27/1998)
- ML18040A330 - Rev 0 to Technical Rept 97181-TR-03, "EPR Testing of Boat Samples from Core Shroud Vertical Welds V-9 & V-10 at NMP Unit 1." (85 page(s), 2/28/1998)
- ML17059B905 - "NMP Unit 1 Boat Samples Analyses Part III:Tension Tests," RDD:98:55863-004-000:01. (118 page(s), 2/28/1998)
- ML17059B906 - Non-proprietary Rev 0 to GE-NE-523-B13-01869-113NP, "Assessment of Crack Growth Rates Applicable to NMP Unit 1 Vertical Weld Indications." (64 page(s), 2/28/1998)
- ML17059B907 - Rev 0 to Technical Rept 97181-TR-02,Vol 1 to "Interpretive Metallurgical Rept on Core Shroud Vertical Weld Boat Samples from NMP Unit 1." (36 page(s), 2/28/1998)