NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 32 to Operating Procedure N1-OP-14, "Containment Spray Sys 80 & 93," in response to NRC 880506 ltr.Procedure revised to incorporate water seal for containment spray sys discharge line isolation valves.

Accession Number: ML17056A471

Date Released: Thursday, June 29, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer