Home > NRC Library > ADAMS Public Documents
Limerick Generating Station, Units 1 & 2 - Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 18 and UFSAR Reference Drawings.
Accession Number: ML16357A167
Date Released: Tuesday, September 5, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16280A335 - Limerick Generating Station, Units 1 & 2 - Submittal of Updated Final Safety Analysis Report (UFSAR), Revision 18 and UFSAR Reference Drawings. (27 page(s), 9/19/2016)
- ML16357A120 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (323 page(s), 9/19/2016)
- ML16357A122 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (192 page(s), 9/19/2016)
- ML16357A124 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems. (786 page(s), 9/19/2016)
- ML16357A126 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendix 3A - Design Assessment Report. (187 page(s), 9/19/2016)
- ML16357A131 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (86 page(s), 9/19/2016)
- ML16357A132 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figure 4.3-1, Model for One-Dimensional Transport Analysis of Vessel Fluence. (17 page(s), 9/19/2016)
- ML16357A133 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (207 page(s), 9/19/2016)
- ML16357A135 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (331 page(s), 9/19/2016)
- ML16357A138 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6A. Subcompartment Differential Pressure Considerations. (20 page(s), 9/19/2016)
- ML16357A139 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix A, Figure 6A-2, Reactor Shield Annulus Subcompartment Model Schematic. (21 page(s), 9/19/2016)
- ML16357A153 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems. (825 page(s), 9/19/2016)
- ML16357A155 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric Power. (170 page(s), 9/19/2016)
- ML16357A156 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figure 8.1-2. (17 page(s), 9/19/2016)
- ML16357A158 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (467 page(s), 9/19/2016)
- ML16357A162 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (72 page(s), 9/19/2016)
- ML16357A163 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figure 10.2-10 through Figure 10.2-13. (15 page(s), 9/19/2016)
- ML16357A141 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (53 page(s), 9/19/2016)
- ML16357A143 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (114 page(s), 9/19/2016)
- ML16357A144 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Figure 14.2-1 through Figure 14.2-9. (14 page(s), 9/19/2016)
- ML16357A147 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Continuous Control Rod Withdrawal Transient Analysis. (8 page(s), 9/19/2016)
- ML16357A148 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figure 15A-1 through Figure 15A-4. (4 page(s), 9/19/2016)
- ML16357A149 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15B, Reload Evaluations. (9 page(s), 9/19/2016)
- ML16357A150 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (3 page(s), 9/19/2016)
- ML16357A151 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (2 page(s), 9/19/2016)
- ML16357A152 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Appendix A. (99 page(s), 9/19/2016)
- ML16357A334 - Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Drawing No. E-0028, Rev 018, Single Line Meter and Relay Diagram D114, D124, D134, D144. Sheet 0001. (1 page(s), 9/19/2016)
- ML17216A517 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Figure 1.2-1 - 1.2-72, . (10 page(s), 9/19/2016)
- ML17216A709 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figure 12.1-1 through Figure 12.4-1. (11 page(s), 9/19/2016)
- ML17216A812 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (265 page(s), 9/19/2016)
- ML17216A762 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figure 13.1-2 through Figure 13.5-2. (8 page(s), 9/19/2016)
- ML17216A788 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Figure 15.0-1 through Figure 15.9.53. (90 page(s), 9/19/2016)
- ML17216A776 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (341 page(s), 9/19/2016)
- ML17216A584 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figure 2.1-1, Site Location Map. (152 page(s), 9/19/2016)
- ML17216A694 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendix B, Figure 3B-13, Irregular Condensation Temperature and Pressure Time Hi (270 page(s), 9/19/2016)
- ML17216A792 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems, Figure 7.1-1, RPS Separation Concept. (67 page(s), 9/19/2016)
- ML17216A801 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Appendix 9A, Fire Protection Evaluation Report. (472 page(s), 9/19/2016)
- ML17216A809 - Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Figure 9A-1 through Figure 9A-21. (48 page(s), 9/19/2016)
- ML17216A240 - Redacted: Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendix A, Figure 3A-1, Design Assessment Report Cross Section of Containment. (474 page(s), 9/19/2016)
- ML17216A201 - Redacted: Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figure 3.5-2, Reactor Enclosure Wall Section at Column Line D. (331 page(s), 9/19/2016)
- ML17216A340 - Redacted: Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figure 5.1-1, Rated Operating Conditions [3458 MWt]. (40 page(s), 9/19/2016)
- ML17216A362 - Redacted: Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figure 6.2-1, Downcomer Design Details. (88 page(s), 9/19/2016)
- ML17216A405 - Redacted: Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figure 9.1-1 through Figure 9.4-12. (75 page(s), 9/19/2016)