Home > NRC Library > ADAMS Public Documents
Forwards rept documenting results of PG&E reevaluation of facts surrounding steam leak repair & subsequent actions taken for 971215 event.Rept & appropriate procedures encl.
Accession Number: ML16342E213
Date Released: Tuesday, February 28, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16342E212 - Forwards rept documenting results of PG&E reevaluation of facts surrounding steam leak repair & subsequent actions taken for 971215 event.Rept & appropriate procedures encl. (6 page(s), 8/17/1998)
- ML16342E214 - "971215 Steam Leak Repair Evaluation." (132 page(s), 8/17/1998)
- ML16342E215 - Rev 3 to OP1.DC18, "Authorization for Equipment Operation & Maintenance." (8 page(s), 4/5/1996)
- ML16342E216 - Rev 1 to OP2, "Tagging Programs." (14 page(s), 1/31/1995)
- ML16342E217 - Rev 8 to OP2.ID1, "Clearances & Administrative Tag-Outs." (82 page(s), 11/17/1997)
- ML16342E218 - Rev 6 to OP2.ID2, "DCPP Tagging Requirements." (18 page(s), 4/16/1997)
- ML16342E219 - Rev 2 to CF4.ID5, "Configuration Control During Maintenance Activities." (10 page(s), 4/10/1996)
- ML16342E220 - Rev 2 to AD7.ID1, "Use of PIMS Work Order Module." (38 page(s), 1/15/1997)
- ML16342E221 - Rev 5 to AD2.ID1, "Procedure Use & Adherence." (22 page(s), 9/23/1996)