NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 1 to LER 96-001 re closure of charging pump recirculation flow path valves placing ECCS in unanalyzed condition.Rev provides cause analysis,safety significance & corrective action determination.

Accession Number: ML16342D276

Date Released: Tuesday, February 28, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer