Home > NRC Library > ADAMS Public Documents
Transmits plan for pre-operational endurance testing of sixth emergency diesel generator.Testing further augments basis for commercial grade dedication of sixth emergency diesel generator.
Accession Number: ML16341G524
Date Released: Tuesday, February 28, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17083C416 - Transmits plan for pre-operational endurance testing of sixth emergency diesel generator.Testing further augments basis for commercial grade dedication of sixth emergency diesel generator. (70 page(s), 4/17/1992)
- ML16341G523 - Rev 1 to Surveillance Test Procedure STP M-81A, "Diesel Engine Generator Insp (18 Month Intervals)." (38 page(s), 9/23/1991)
- ML16341G525 - Rev 0 to Surveillance Test Procedure STP M-81B, "Diesel Engine Generator Insp (36 Month Intervals)." (10 page(s), 8/13/1991)
- ML16341G526 - Rev 0 to Surveillance Test Procedure STP M-81C, "Diesel Engine Generator Insp (54 Month Intervals)." (10 page(s), 8/13/1991)
- ML16342B869 - Rev 0 to Surveillance Test Procedure STP M-81D, "Diesel Engine Generator Insp (72 Month Intervals)." (10 page(s), 8/13/1991)
- ML16341G527 - Rev 1 to Surveillance Test Procedure STP M-81E, "Diesel Engine Generator Insp (90 Month Intervals)." (16 page(s), 10/24/1991)
- ML16341G528 - Rev 0 to Surveillance Test Procedure STP M-81F, "Diesel Engine Generator Insp (108 Month Intervals)." (12 page(s), 8/13/1991)
- ML16342C286 - Rev 0 to Surveillance Test Procedure STP M-81G, "Diesel Engine Generator Insp (Electrical 18-Month Intervals)." (12 page(s), 8/13/1991)