Board Notification 83-135A:forwards 830919 revised draft of "QA Case Study Working Paper - Case C," & cover & transmittal memos re Diablo Canyon.
Accession Number: ML16340D758
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16340D757 - Board Notification 83-135A:forwards 830919 revised draft of "QA Case Study Working Paper - Case C," & cover & transmittal memos re Diablo Canyon. (6 page(s), 10/14/1983)
- ML16340D907 - Informs that working papers for three QA case studies complete,per 830923 memo.Case C re Diablo Canyon,dtd 830919, is rev to 830719 draft transmitted in Board Notification 83-135 on 830902.Papers & transmittal ltrs forwarded. (4 page(s), 9/28/1983)
- ML16340D908 - Forwards case study working papers for site,per review of QA program for plant design & const.Final Congressional rept will contain consolidated summary of case study conclusions. (2 page(s), 8/2/1983)
- ML16340D909 - Forwards revised draft of "QA Case Study Working Paper - Case C." (2 page(s), 9/27/1983)
- ML16340D910 - Revised draft of "QA Case Study Working Paper - Case C." (84 page(s), 9/19/1983)