Home > NRC Library > ADAMS Public Documents
Forwards "Verification of Instrument & Control Design of Auxiliary Feedwater Sys," Interim Technical Rept 27, Rev 0 & "Verification of Instrumentation & Control Design of Control Room..." Interim Technical Rept 28,Rev 0.
Accession Number: ML16340D068
Date Released: Tuesday, February 28, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16341B891 - Forwards "Verification of Instrument & Control Design of Auxiliary Feedwater Sys," Interim Technical Rept 27, Rev 0 & "Verification of Instrumentation & Control Design of Control Room..." Interim Technical Rept 28,Rev 0. (4 page(s), 12/30/1982)
- ML16340D067 - "Verification of Instrument & Control Design of Auxiliary Feedwater Sys," Interim Technical Rept 27,Rev 0. (48 page(s), 12/23/1982)
- ML16340D069 - "Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys," Interim Technical Rept 28,Rev 0. (50 page(s), 12/23/1982)