Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit Nos. 1 and 2, Request for Licensing Action to Revise the Emergency Plan.
Accession Number: ML16277A194
Date Released: Tuesday, October 18, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16277A113 - Beaver Valley Power Station, Unit Nos. 1 and 2, Request for Licensing Action to Revise the Emergency Plan. (1316 page(s), 9/28/2016)
- ML16277A114 - ERS-MPD-93-007, Rev. 11, "BVPS-U1 Gaseous Radioactivity Monitor Emergency Action Levels." (40 page(s), 10/28/2015)
- ML16277A115 - ERS-HHM-87-014, Rev. 8, "Unit 1 / Unit 2 ODCM Gaseous Effluent Monitor Setpoints." (35 page(s), 1/30/2015)
- ML16277A116 - ERS-ATL-93-021, Rev. 4, "Process Alarm Setpoints for Liquid Effluent Monitors." (49 page(s), 4/26/2012)
- ML16277A117 - ERS-JTL-99-005, Rev. 3, "Unit 1 Letdown Radiation Monitor (RM-1CH-101) Alarm Setpoint Calculation and Emergency Action Level (EAL) ERS-JTL-99-005 21 Value Determination." (21 page(s), 8/9/2011)
- ML16277A118 - ERS-SMM-11-002, "Containment Radiation Monitor Readings Following Clad Damage (FC2 Loss, FC7 Loss, RC2 Loss and CT2 Potential Loss)." (15 page(s), 8/7/2011)
- ML16277A119 - 8700-SP-1RC-30, "Instrument Uncertainty for Refueling Level Indicator LI-1RC-481C." (14 page(s), 3/29/2016)
- ML16277A120 - 8700-DEC-0248, "Coping Duration for Station Blackout (SBO)." (46 page(s), 4/7/2003)
- ML16277A121 - ERS-MPD-93-008, Rev. 8, "BVPS - U2 Gaseous Radioactivity Monitor Emergency Action Levels." (36 page(s), 10/16/2015)
- ML16277A122 - ERS-LMR-14-001, Rev. 1, "Liquid Monitor Alert Emergency Action Level (EAL) Set Points." (10 page(s), 4/20/2015)
- ML16277A123 - ERS-ATL-93-021, Rev. 4, "Process Alarm Setpoints For Liquid Effluent Monitors." (10 page(s), 4/26/2012)
- ML16277A124 - ERS-SFL-88-027, Rev. 3, "Process Safety limits, alarm Setpoints and EAL Indicator Value for 2CHS-RQ101A/B." (13 page(s), 8/10/2011)
- ML16277A125 - 10080-DEC-0246, Rev. 0, "Coping Duration For Station Blackout (SBO)." (45 page(s), 4/7/2003)
- ML16277A127 - ERS-SMM-11-002, "Containment Radiation Monitor Readings Following Clad Damage (FC2 Loss, FC7 Loss, RC2 Loss and CT2 Potential Loss)." (15 page(s), 8/7/2011)