Home > NRC Library > ADAMS Public Documents
CRGR September 13, 2016 Public Meeting on Backfitting.
Accession Number: ML16251A475
Date Released: Thursday, October 20, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16258A299 - Summary of September 13, 2016, Committee to Review Generic Requirements (CRGR) Public Meeting with Interested Stakeholders Regarding Backfitting and the Backfitting Process. (5 page(s), 10/4/2016)
- ML16258A311 - Enclosure 1: September 13, 2016, CRGR Public Meeting for List of Attendees. (2 page(s), 10/4/2016)
- ML16251A483 - Enclosure 2: Agenda for September 13, 2016 ,Public Meeting on Backfitting. (1 page(s), 10/4/2016)
- ML16265A418 - Enclosure 3: Committee to Review Generic Requirements (CRGR) - September 13, 2016, Public Meeting to Discuss Backfitting. (12 page(s), 9/13/2016)
- ML16265A431 - Enclosure 4: September 13, 2016, Nuclear Energy Institute, Presentation. (7 page(s), 9/13/2016)
- ML16265A435 - Enclosure 5: September 13, 2016, Duke Energy, Public Meeting Slides on Backfitting. (7 page(s), 9/13/2016)
- ML16265A439 - Enclosure 6: September 13, 2016, Exelon Generation, Public Meeting Slides on Facility-Specific & Compliance Backfits. (8 page(s), 9/13/2016)
- ML16265A444 - Enclosure 7: September 13, 2016, FirstEnergy Nuclear Operating Company, Public Meeting Slides on Regulatory Challenges During Inspection. (7 page(s), 9/13/2016)
- ML16265A446 - Enclosure 8: September 13, 2016, Union of Concerned Scientist Slides. (30 page(s), 9/13/2016)
- ML16264A448 - Enclosure 9: Transcripts For September 13, 2016 CRGR Public Meeting. (174 page(s), 10/4/2016)