Home > NRC Library > ADAMS Public Documents
Forwards NRC prepared testimony per ASLB 810401 third prehearing conference order.Stipulation also encl for review & signature.
Accession Number: ML16251A407
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19347E402 - Forwards NRC prepared testimony per ASLB 810401 third prehearing conference order.Stipulation also encl for review & signature. (7 page(s), 4/23/1981)
- ML19347E443 - Forwards IE Investigation Repts 50-498/78-05 & 50-499/78-05 on 780321.No noncompliance noted. (2 page(s), 4/3/1978)
- ML19347E494 - Forwards IE Investigation Repts 50-498/80-13 & 50-499/80-13 on 800527 & 810225-27.No noncompliance noted. (2 page(s), 3/18/1981)
- ML19347E489 - Testimony re proposed mgt organization for operations phase of project.Managerial competence based on applicant plan for organization of operations addressed.Prof qualifications encl. (8 page(s), 4/23/1981)
- ML19347E433 - IE Investigation Rept 50-498/77-08 on 770706-08.No noncompliance noted.Major area investigated:alleged threats directed towards QC inspectors if unacceptable items were identified during concrete placement insps. (8 page(s), 8/2/1977)
- ML17198A131 - IE Investigation Repts 50-498/78-09 & 50-499/78-09 on 780516-18.No noncompliance noted.Major area investigated: allegations of falsifications on cadweld records re lack of QC inspectors' qualifications & procedure violations. (7 page(s), 6/6/1978)
- ML19347E410 - Testimony re IE Investigation Rept 79-19 & 800430 show cause order.Prof qualifications encl. (60 page(s), 4/23/1981)
- ML19347E484 - Forwards IE Insp Repts 50-498/81-01 & 50-499/81-01 during Jan 1981. (2 page(s), 3/26/1981)
- ML19347E482 - Discusses IE Insp Repts 50-498/81-01 & 50-499/81-01 on 810107-30 & forwards notice of violation. (1 page(s), 3/20/1981)
- ML19347E411 - Testimony by WA Crossman,RE Hall,WG Hubacek,SH PHillips, DP Tomlinson & JI Tapia re IE activity following 800430 show cause order.W/prof qualifications. (70 page(s), 4/23/1981)
- ML16251A406 - Forwards IE Investigation Repts 50-498/78-15 & 50-499/78-15 on 780911-14 & notice of violation. (3 page(s), 10/6/1978)
- ML19347E415 - Forwards IE Insp Rept 50-498/77-05 on 770328-31. (2 page(s), 4/19/1977)
- ML19347E488 - Responds to violations noted in IE Insp Repts 50-498/79-14 & 50-499/79-14.Corrective actions:supplemental data documented on exam check form by lead inspector.Entry dated & signed. (2 page(s), 11/16/1979)
- ML19347E450 - Forwards IE Investigation Repts 50-498/78-09 & 50-499/78-09 on 780516-18.No noncompliance noted. (2 page(s), 6/6/1978)
- ML19347E475 - Notice of violation from investigation on 780911-14. (2 page(s), 10/6/1978)
- ML19347E480 - IE Investigation Repts 50-498/80-21 & 50-499/80-21 on 800728-0801 & 04.Major area investigated:allegation of maint record falsification & that millwright foreman is not qualified. (11 page(s), 8/28/1980)
- ML19347E474 - IE Insp Repts 50-498/81-04 & 50-499/81-04 during Feb 1981. No noncompliance noted.Major areas inspected:followup re noncompliances,unresolved items & show cause order items. (8 page(s), 3/11/1981)
- ML19347E419 - IE Insp Repts 50-498/78-08 & 50-499/78-08 on 780516-19.No noncompliance noted.Major areas inspected:const activities including review of status of quality procedure development & records on concrete placement in Unit 1. (4 page(s), 5/26/1978)
- ML19347E491 - Testimony responding to ASLB Issue D re whether QA/QC program implemented for balance of const activity at project meets requirements.Prof qualifications encl. (8 page(s), 4/23/1981)
- ML19347E476 - Forwards IE Insp Repts 50-498/81-06 & 50-499/81-06 on 810223-27.No noncompliance noted. (2 page(s), 3/18/1981)
- ML19347E435 - Forwards IE investigation Repts 50-498/77-14 & 50-499/77-09 on 771215-16.No noncompliance noted. (2 page(s), 12/28/1977)
- ML19347E483 - Notice of violation from insp on 810107-30.Noncompliance noted:reactor pressure vessel & pump casing not sealed to preclude airborne contamination & access to vessel was not controlled. (2 page(s), 3/19/1981)
- ML17198A130 - IE Insp Rept 50-498/77-05 on 770328-31.Noncompliance noted: sampling of production cadwelds did not meet frequency requirements. (18 page(s), 4/18/1977)
- ML19347E470 - Responds to NRC ltr re violations noted in IE Investigation Repts 50-498/78-13,50-499/78-13,50-498/78-12 & 50-499/78-12. Corrective actions:QC personnel retrained,Brown & Root procedure clarified & previous work reviewed. (7 page(s), 10/3/1978)
- ML19347E479 - IE Investigation Repts 50-498/78-15 & 50-499/78-15 on 780911-14.Noncompliance noted:failure to follow cadweld procedure & failure to provide specified inprocess insp. (14 page(s), 10/6/1978)
- ML19347E439 - IE Investigation Repts 50-498/77-14 & 50-499/77-09 on 771215-16.No noncompliance noted.Major area investigated: allegation that radiographs showed faulty welds at site. (4 page(s), 12/28/1977)
- ML19347E481 - IE Insp Repts 50-498/81-06 & 50-499/81-06 on 810223-27.No noncompliance noted.Major areas inspected:const activities re review of responses to IE Insp Repts 50-498/79-19 & 50-499/79-19. (6 page(s), 3/17/1981)
- ML19347E477 - Forwards IE Investigation Repts 50-498/80-21 & 50-499/80-21 on 800728-0801 & 04.No noncompliance noted. (2 page(s), 3/19/1981)
- ML19347E487 - IE Insp Repts 50-498/81-01 & 50-499/81-01 during Jan 1981. Noncompliance noted:failure to follow procedures for storage & maint of equipment. (18 page(s), 3/20/1981)
- ML19347E486 - IE Insp Repts 50-498/81-08 & 50-499/81-08 on 810302-06.No noncompliance noted.Major areas inspected:followup on show cause order items & immediate action ltrs. (4 page(s), 3/13/1981)
- ML19347E473 - IE Investigation Repts 50-498/80-13 & 50-499/80-13 on 800527 & 810225-27.No noncompliance noted.Major areas investigated:alleged irregularities in welding program, vendor surveillance program & safety related piping. (13 page(s), 3/17/1981)
- ML19347E412 - Forwards IE Investigation Rept 50-498/77-03 on 770202-03. No noncompliance noted. (2 page(s), 2/15/1977)
- ML19347E467 - Forwards IE Investigation Repts 50-498/78-12 & 50-499/78-12 on 780725-28.No noncompliance noted. (2 page(s), 8/22/1978)
- ML19347E472 - IE Investigation Repts 50-498/78-14 & 50-499/78-14 on 780822-25.No noncompliance noted.Major area investigated: allegation of misconduct by Brown & Root QC employee. (11 page(s), 9/13/1978)
- ML19347E413 - IE Investigation Rept 50-498/77-03 on 770202-03.No noncompliance noted.Major area investigated:licensee reported falsification of test records of concrete constituent matls. (6 page(s), 2/14/1977)
- ML19347E408 - Testimony by WC Seidle,WA Crossman,WG Hubacek,RG Taylor & HS Phillips on history of const activity leading up to 800430 show cause order.Summarizes NRC investigative & enforcement activity.Prof qualifications encl. (89 page(s), 4/23/1981)
- ML19347E485 - Responds to NRC 800131 ltr re addl info on violations noted in IE Insp Repts 50-498/79-13 & 50-499/79-13.Corrective actions:revised QA manual to add paragraph re corporate QA coordinator. (2 page(s), 2/26/1980)
- ML19347E418 - Forwards IE Insp Repts 50-498/78-08 & 50-499/78-08 on 780516-19.No noncompliance noted. (2 page(s), 5/26/1978)
- ML19347E448 - IE Investigation Repts 50-498/78-05 & 50-499/78-05 on 780321.No noncompliance noted.Major area investigated: allegation by Brown & Root employee that job is in jeopardy for insisting on compliance w/documentation procedures. (3 page(s), 3/31/1978)
- ML19347E420 - Forwards IE Investigation Rept 50-498/77-08 on 770706-08.No noncompliance noted. (2 page(s), 8/2/1977)
- ML19347E471 - Forwards IE Investigation Repts 50-498/78-14 & 50-499/78-14 on 780822-25.No noncompliance noted. (2 page(s), 9/15/1978)
- ML19347E469 - IE Insp Repts 50-498/78-12 & 50-499/78-12 on 780725-28.No noncompliance noted.Major area investigated:allegations of insufficent training for implementation of newly issued procedures. (13 page(s), 8/22/1978)
- ML19347E493 - Testimony addressing whether applicant proposed QA program meets requirements,in response to ASLB Issue F.Prof qualifications encl. (4 page(s), 4/23/1981)
- ML19347E492 - Responds to NRC 800303 ltr re addl info on violations noted in IE Insp Repts 50-498/79-16 & 50-499/79-16.Corrective actions:const procedure revised to state no standing water will be allowed on const joints. (2 page(s), 4/2/1980)
- ML19347E490 - Responds to NRC 800111 ltr re addl info on violations noted in IE Insp Repts 50-498/79-14 & 50-499/79-14.Corrective actions:inspector initialed & dated concrete placement card. (2 page(s), 1/25/1980)