Home > NRC Library > ADAMS Public Documents
08/10/2016 - Meeting with NEI
Accession Number: ML16209A375
Date Released: Tuesday, October 4, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16209A382 - NEI 16-03 Discussion Points. (1 page(s), 7/27/2016)
- ML16231A329 - 08/10/2016 - Summary of Meeting with the Nuclear Energy Institute to Discuss NEI 16-03, "Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools" (Draft). (3 page(s), 9/27/2016)
- ML16221A182 - 08/10/2016 NEI 16-03 Discussion. (2 page(s), 8/1/2016)
- ML16272A272 - 08/10/2016 - NEI 16-03 Draft B Pre-Meeting. (14 page(s), 8/31/2016)
- ML16272A273 - 08/10/2016 - NEI 16-03 Draft B Post-NRC Meeting. (14 page(s), 8/31/2016)
- ML16272A343 - 08/10/2016 - Meeting Attendee List. (1 page(s), 8/10/2016)
- ML16272A345 - 08-10-2016 - NEI Supplemental Material 3 (EPRI Neutron Absorber Projects). (17 page(s), 8/10/2016)
- ML16272A346 - 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013). (6 page(s), 8/10/2016)
- ML16272A347 - 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density). (14 page(s), 8/10/2016)