Home > Site Help > Search Results
Public Teleconference with KHNP to Discuss RAIs Held on May 18 2016.
Accession Number: ML16174A208
Date Released: Friday, July 8, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16174A210 - Enclosure - List of attendees for Public Teleconference with KHNP Regarding Chapter 3 RAIs Held on May 18 2016. (1 page(s), 6/29/2016)
- ML16174A219 - 05/18/2016 Summary of Public Teleconference with Korea Hydro and Nuclear Power Co., to Discuss Topics Related to The Advanced Power Reactor 1400 Design Certification Document. (2 page(s), 6/29/2016)
- ML16174A220 - 05/03/2016 Meeting Agenda for Bi-Weekly Seismic Call. (1 page(s), 6/29/2016)
- ML16174A221 - 05/18/2016 Bi-Weekly Seismic Call Meeting Minutes. (2 page(s), 6/29/2016)
- ML16174A226 - Response to NRC Feedback on Draft RAI 129-8085 - Question 3.8.1-1. (2 page(s), 6/29/2016)
- ML16174A227 - Response to NRC Feedback on Draft RAI 227-8274 - Question 3.8.4-3. (2 page(s), 6/29/2016)
- ML16174A228 - Response to Staff feedback on KHNP Draft Revised Response to RAI 3.7.1-5. (1 page(s), 6/29/2016)
- ML16174A323 - Staff Feedback on Draft RAI 129-8085 - Question 3.8.1-1. (2 page(s), 6/29/2016)
- ML16174A328 - Staff Feedback on Draft RAI 227-8274 - Question 3.8.4-3. (2 page(s), 6/29/2016)
- ML16174A342 - Staff feedback on KHNP Draft Revised Response to RAI 3.7.1-4. (2 page(s), 6/29/2016)
- ML16174A367 - Staff feedback on KHNP Draft Revised Response to RAI 3.7.1-8. (2 page(s), 6/29/2016)
- ML16174A384 - Affidavit KAW-16-0513. (2 page(s), 6/29/2016)
- ML16175A387 - Korea Hydro and Nuclear Power Co., Ltd - Draft Revised Response to RAI 199-8223, 03.08.01-13. (2 page(s), 6/29/2016)
- ML16175A391 - Korea Hydro and Nuclear Power Co., Ltd - Revised Response to RAI 182-8160 - Question 03-07-01-1. (21 page(s), 6/29/2016)
- ML16175A393 - Korea Hydro and Nuclear Power Co., Ltd - Draft Revised Response to RAI 227-8274 - Question 03.08.04-3. (9 page(s), 6/29/2016)
- ML16175A395 - Korea Hydro and Nuclear Power Co., Ltd - Draft Revised Response to RAI 253-8300 - Question 03.07.01-5. (67 page(s), 6/29/2016)
- ML16175A403 - Generic Soil Profiles. (42 page(s), 6/29/2016)