Home > Site Help > Search Results

Forwards second 10-yr ISI interval Request for Relief 92-15. Relief required due to inability to isolate 8 welds in EFS from SG in order to perform required hydrostatic test after valve replacements by welding.W/one oversize drawing.

Accession Number: ML16148B185

Date Released: Monday, June 1, 2015

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer