Home > NRC Library > ADAMS Public Documents
Determination Of Acceptability And Sufficiency For Docketing, Proposed Review Schedule, And Opportunity For A Hearing For The Application From Entergy Operations, Inc.
Accession Number: ML16130A015
Date Released: Thursday, June 2, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16130A023 - Waterford Station, Unit 3, Acceptance-Letter Determination Of Acceptability And Sufficiency For Docketing, Proposed Review Schedule, And Opportunity For A Hearing Regarding The Application From Entergy Operations, Inc., For Renewal Of The Operating.... (5 page(s), 5/20/2016)
- ML16131A008 - Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3, FRN. (11 page(s), 5/20/2016)